Ramillies-class ship of the line

From Wikipedia, the free encyclopedia

Loss of HMS Ramillies by Robert Dodd
Class overview
NameRamillies class
Operators Royal Navy
Preceded byCanada class
Succeeded byAlbion class
In service4 September 1762 – 1817
Completed9
Lost5
General characteristics
TypeShip of the line
Length
  • 168 ft 6 in (51.36 m) (gundeck)
  • 138 ft 3+38 in (42.148 m)(keel) (first group)
  • 138 ft 1 in (42.09 m) (keel) (second group)
Beam
  • 46 ft 9 in (14.25 m) (first group)
  • 46 ft 11 in (14.30 m) (second group)
PropulsionSails
Complement550
Armament
  • 74 guns:
  • Gundeck: 28 × 32 pdrs
  • Upper gundeck: 28 × 18 pdrs
  • Quarterdeck: 14 × 9 pdrs
  • Forecastle: 4 × 9 pdrs
NotesShips in class include: Ramillies, Monarch, Magnificent, Marlborough, Terrible, Russell, Invincible, Robust, Prince of Wales

The Ramillies-class ships of the line were a class of nine 74-gun third rates, designed for the Royal Navy by Sir Thomas Slade.

Design

[edit]

The draught for the Ramillies class was very similar to that of the Bellona class and subsequent Arrogant class, with the only real differences to be found in the shape of the underwater hull. There were two distinct sub-groups; four ships were built in the Royal Dockyards to the original design, approved on 25 April 1760 – although the name-ship Ramillies had originally been ordered as a Bellona-class unit. Slade subsequently amended his design for the ships which were to be built by commercial contractors – this modified design, with slightly amended dimensions, being approved on 13 January 1761.

Ships

[edit]

First group

[edit]

Dockyard-built ships:

Builder: Chatham Dockyard
Ordered: 1 December 1759
Laid down: 25 August 1760
Launched: 25 April 1763
Completed: November 1763
Fate: Abandoned and burned off Newfoundland, 21 September 1782.
Builder: Deptford Dockyard
Ordered: 22 November 1760
Laid down: 2 June 1761
Launched: 20 July 1765
Completed: 24 September 1765
Fate: Broken up at Chatham, March 1813
Builder: Deptford Dockyard
Ordered: 16 December 1761
Laid down: 15 April 1762
Launched: 20 September 1767
Completed: September 1778
Fate: Wrecked off Brest, 25 March 1804.
Builder: Deptford Dockyard
Ordered: 4 December 1762
Laid down: 3 June 1763
Launched: 26 August 1767
Completed: 1 December 1767
Fate: Wrecked off Belle Île, 4 November 1800

Second (modified) group

[edit]

Contract-built ships:

Builder: John Barnard, Harwich
Ordered: 1 January 1761
Laid down: February 1761
Launched: 4 September 1762
Completed: 18 December 1762
Fate: Burned following the Battle of the Chesapeake, 11 September 1781
Builder: Thomas West, Deptford
Ordered: 1 January 1761
Laid down: June 1761
Launched: 10 November 1764
Completed: 6 January 1765 at Woolwich Dockyard
Fate: Sold out of the service in the East Indies, 1811
Builder: John and William Wells, Deptford
Ordered: 12 October 1761
Laid down: December 1761
Launched: 9 March 1765
Completed: February 1777 at Chatham Dockyard.
Fate: Wrecked off Yarmouth, 16 March 1801
Builder: John Barnard, Harwich
Ordered: 16 December 1761
Laid down: February 1762
Launched: 25 October 1764
Completed: 10 December 1764
Fate: Broken up at Portsmouth, January 1817
Builder: Henry Bird and Roger Fisher, Milford Haven
Ordered: 16 December 1762
Laid down: March 1762
Launched: 4 June 1765
Completed: 22 December 1770 at Plymouth Dockyard
Fate: Broken up at Plymouth, August 1783